A CRITICAL PATH METHOD APPROACH TO A GREEN PLATFORM SUPPLY VESSEL HULL CONSTRUCTION

Eda Turan YTU , Mesut Güner YTU

International journal of industrial engineering

Abstract

This study generates a critical path method approach for the first Green Platform Supply Vessel hull constructed in Turkey. The vessel was constructed and partly outfitted in a Turkish Shipyard and delivered to Norway. The project management of the vessel was conducted utilizing Critical Path Method (CPM) and the critical paths during construction and partly outfitting period of this sophisticated vessel were presented. Additionally, the precautions in order to prevent the delay of the project were discussed.

Keywords

Critical path method Hull Shipyard Path (computing) Turkish Shipbuilding Computer science Engineering Marine engineering Operations research Operations management Systems engineering Operating system Geography

Subject Areas

Logistics and Infrastructure Analysis ·Forestry ·Life Sciences
Structural Integrity and Reliability Analysis ·Mechanical Engineering ·Physical Sciences
Transportation Systems and Infrastructure ·Management of Technology and Innovation ·Social Sciences

Citations by Year