Journal Article

·2013

An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

Burhanettin Çetin YTU

Energy Sources Part B Economics Planning and Policy

Abstract

Abstract Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV. Keywords: boiler revampingeconomic analysispayback periodthermal power plant

Keywords

Pulverized coal-fired boiler Boiler (water heating) Environmental science Waste management Coal Engineering

Subject Areas

Advanced Power Generation Technologies ·Electrical and Electronic Engineering ·Physical Sciences

Citations by Year

OpenAlex SDG Match

SDGs auto-classified by OpenAlex (score ≥ 0.4 shown).

Affordable and clean energy 65%