Abstract
In this study artificial neural networks are applied for finite capacity scheduling. Utilisation of artificial neural networks on solving finite scheduling problems is examined. Also a comparative model is proposed by using multi layer perceptron (MLP) neural networks and branch-and-bound algorithm, and carried out to solve a real world problem in a job shop scheduling system.
Keywords
Subject Areas
Citations by Year
OpenAlex SDG Match
SDGs auto-classified by OpenAlex (score ≥ 0.4 shown).