Conference Article

·2011

Economical Analysis of a Chemical Heat Pump System for Waste Heat Recovery

Hakan Demir YTU , Özden Ağra YTU , Ş. Özgür Atayılmaz YTU

Linköping electronic conference proceedings

Abstract

A Whispergen Mk Vb 1KW e Stirling Engine mCHP unit was integrated into a test rig simulating a typical UK domestic hydronic heating system and tested implementing derived heat demand profiles in the house over the yearly period.The obtained experimental performance was used as input data for static simulations in CANMET Energy RETScreen software to calculate economical and environmental benefits from deployment of the mCHP instead of a condensing boiler.Simulation results show that a 16% annual monetary savings can be achieved due to the introduction of new UK feed-in tariffs.The payback period when using the mCHP system instead of a condensing boiler is about 8 years.These results can be used for determination of strategy for further improvement of the performance of the unit.

Keywords

Heat pump Waste management Waste heat Waste heat recovery unit Environmental science Heat recovery ventilation Process engineering Nuclear engineering Engineering Heat exchanger Mechanical engineering

Subject Areas

Adsorption and Cooling Systems ·Mechanical Engineering ·Physical Sciences
Process Optimization and Integration ·Control and Systems Engineering ·Physical Sciences
Geothermal Energy Systems and Applications ·Renewable Energy, Sustainability and the Environment ·Physical Sciences

OpenAlex SDG Match

SDGs auto-classified by OpenAlex (score ≥ 0.4 shown).

Affordable and clean energy 41%